France, ball joint bases on stringers – 14 MWp
For this 14 MWp project in France, we supplied a structure based on screws, which we pre-drilled.
For this 14 MWc site in France, we provided a structure based on ball joint bases on stringers.
SigueSol will be present at Intersolar Europe 2026 in Munich (Germany) • 23–25 June 2026 • Hall A5 – Booth A5.655 → Register for the event
For this 14 MWp project in France, we supplied a structure based on screws, which we pre-drilled.
For this 14 MWc site in France, we provided a structure based on ball joint bases on stringers.