Belgium, ground structure 1.85 MWc
A 100% local project for Belourthe, with Reno Energy and Ecostal!
Total installed power: 1.85 MWp
Particularities of the project: as the site is located in a flood zone, we adapted our structure on screw foundations with a low point of 1.20m. As usual in such situations, our team managed the logistics of this project on waterlogged ground without difficulty.
Our support: we coordinated the “structure” part from design to installation of the panels, supplied by our parent company, Ecostal.